GEstimator

GEstimator user manual

For application development, start with the developer documentation index.

GEstimator prepares cost and quantity estimates of civil and electrical works with detailed rate analysis. This manual walks through the workflow with a sample estimate: a small staff quarters building priced from the bundled DSR 2023 (Civil) database.

1. The workspace

Schedule of a sample estimate

Tables work like a spreadsheet. Click a cell to select it, double-click (or press Enter or F2) to edit, Tab to accept and move to the next cell, Escape to cancel. Ctrl+click and Shift+click select several rows. Right-click a row for its context menu.

A dark theme is available from the moon icon in the title bar.

Dark theme

2. Start or open a project

Start page

With no project open, the Schedule view shows the start page:

GEstimator edits an isolated working copy of the project. The file on disk changes only when you save (see section 9).

Give the estimate a name and code prefixes in Project settings (application menu). Project settings also hold free-form project notes.

3. Attach a database

A database is any .eproj file whose items and resources you copy into your estimate. GEstimator comes with:

Databases are opened read-only: nothing you do in an estimate changes them. Older schedules (DSR 2016–2021, DSR (E&M) 2016–2022 and others) can be downloaded from Other databases.

The bundled databases and every .eproj file in your database folder are attached automatically each time a project opens. Use Attach database… only for other databases:

  1. Open the Databases tab and click Attach database….
  2. Enter or browse to a .eproj file under Library project.
  3. Keep Remember for future projects ticked to attach it automatically next time.
  4. Click Attach library.

Attach a database

Database folder opens the folder for your own databases. A .eproj file placed there is attached the next time a project opens, or use Rescan database folder in the dialog.

4. Build the schedule

The Schedule holds the items of the estimate: code, description, unit, rate, quantity, amount and remarks. Items are grouped in categories; an item can have subitems, and a heading row carries the common description of its subitems.

Add items from a database

  1. In Schedule, select the row after which the new items go.
  2. Click Add from database (Ctrl+L).
  3. Choose the database, search for the work (for example cement plaster) and narrow the list with All categories if needed.
  4. Select one or more items (Ctrl+click or Shift+click) and click Add selected items.

Add items from a database

GEstimator copies each item with its rate analysis, the resources the analysis uses and any parent headings, so every rate stays traceable. Codes of imported resources carry the database prefix (for example DC23:0367) so that the same resource from two databases stays one row.

Database notes

Enter items directly

The Overall estimate total below the table always covers the whole project, whatever the search or filter shows.

5. Check and edit rate analyses

Select an item and click Edit analysis to open its rate analysis. The Project explorer on the left lists the schedule items and resources for quick reference.

Rate analysis of item 5.3

An analysis is a list of rows, calculated from top to bottom:

Row Meaning
Group A heading such as MATERIALS or LABOUR, followed by resource rows (code, quantity, rate, amount) and a group total.
Subtotal Sums the rows above it and becomes the base for the next rows.
Weighted addition Adds a fraction of the base, for example Add CP&OH @ 15% (0.15) or water charges (0.01).
Multiplier Replaces the running total with the base multiplied by a factor, for example to divide a lot rate by its quantity.
Round off Rounds the running total, for example to the nearest 0.05.

Bulk edit analyses

Bulk edit analysis (Schedule ribbon) changes many analyses at once with rules: for example set the CP&OH row to 10 % in every selected item, replace a resource, or delete water charges. Conditions select rows by kind, description, code or value. Preview shows every change before you apply it, and the whole edit is one undo step. Rule sets can be saved as presets.

6. Manage resources and rates

Resources

Resources are the materials, labour and plant on which analyses are built. Each resource has a code, description, unit, rate, tax %, discount and reference. Changing a resource rate updates every analysis and item that uses it.

7. Record measurements

Measurements record the detailed dimensions behind each quantity.

Measurements

  1. In Measurements, click Add item and choose a template. NLBH (numbers, length, area, volume) suits most civil items. Other templates cover several linked quantities, steel reinforcement, electrical points and round or rectangular ducting.
  2. Double-click the measurement (or click Edit records) to open its records.
  3. Link the measurement to a schedule item under Measured quantity: type or search the item code.
  4. Add records with Add record (Ctrl+I) or Add multiple records, and fill in the dimensions. Cells accept arithmetic such as 2*3.5+1.2. A negative number deducts, for example a door opening.
  5. Click Apply records.

Measurement records

When the measurements are complete, click Update quantities in the Measurements ribbon to copy the measured totals into the schedule quantities, with the rounding chosen next to it. Measured quantities in the Schedule ribbon does the same for the selected items.

Import records brings dimensions in from a spreadsheet range, and Properties changes the template constants and links of a measurement.

Numeric expressions

Numeric fields accept +, -, *, /, //, % and ** (powers), parentheses, and the constants pi and e. Functions are called directly, such as sqrt(9):

For example, use pi*(0.3**2)/4 for a circular area or max(sqrt(9), abs(-4)) + sin(pi/2) for a nested expression. Trigonometric functions use radians; use sin(radians(30)) for a 30-degree angle. log(x) is the natural logarithm; log(x, base) chooses a base. round(x) rounds to an integer, and round(x, digits) chooses the number of decimal places. min and max take one or more numeric arguments separated by commas.

Expressions allow up to 200 characters. Power exponents and round digits are limited to -12 through 12; round digits must be integers. Intermediate values must be finite, real and no greater than 1e12 in magnitude. Functions accept positional arguments only. Computed entries in rate and quantity fields round to six decimal places; measurement records retain their expressions and use their template’s calculation and display rounding.

8. Import from and export to Excel

9. Save, tabs and recovery

10. Settings

11. Use an AI assistant (MCP)

GEstimator can run a local Model Context Protocol server so that an AI assistant (Claude, or any MCP client) reads and prepares estimates in the open project, using the same operations as the application.

  1. Tick Enable the MCP server for AI assistants in Program settings → General. The MCP tab appears.
  2. Click Configure server to choose the port and the access mode: Read only or Read and write. Copy the client configuration (endpoint and connection token) into your AI client.
  3. Click Start server.

MCP server settings

The assistant reads database notes before choosing items, searches databases, imports items, edits analyses and records measurements. Every change it makes appears in the open project at once and is one undo step, so you can review it like your own edits. The server listens only on your computer, and only clients with the connection token can use it.

Ask for an estimate

GEstimator gives the assistant estimation guides (skills) for civil measurement, electrical measurement and preliminary lighting design. The assistant reads the guide that fits your request before it measures and chooses items. Ask in plain words, for example:

The assistant first shows draft measurements and proposed items. Each line lists the location, dimensions or count, calculation, source and assumptions. It also flags missing inputs and items that need your decision. It writes to the project only when you ask it to apply the estimate. Lighting design results are marked provisional.

To choose a guide yourself in Claude Code, type @ and pick the resource, for example @gestimator:gestimator://skills/civil-measurement-estimation. The guides are available whenever the server runs, even with no project open.

After adding the server to an AI client, start a new session in that client so it loads GEstimator’s tools. If the assistant writes its own script to talk to the server, or builds the estimate in a spreadsheet, the server is not loaded in that session: restart the client and check that GEstimator appears in its MCP server list (for example claude mcp list or codex mcp list). It also helps to name the guide in the request, for example “use the GEstimator civil measurement skill”. Treat the connection token like a password: do not paste it into conversations you share, and use Rotate token if it has been exposed.

12. Keyboard shortcuts

The full list is under Keyboard shortcuts (the ? icon in the title bar). The most used:

Action Keys
Open / save / save copy Ctrl+O / Ctrl+S / Ctrl+Shift+S
Find in current view Ctrl+F
New / close project tab, next tab Ctrl+T / Ctrl+W, Ctrl+Tab
Undo / redo Ctrl+Z / Ctrl+Y
Add item, record or resource / add subitem Ctrl+I / Ctrl+Shift+I
Add from database Ctrl+L
Copy / paste / duplicate / delete rows Ctrl+C / Ctrl+V / Ctrl+D / Delete
Move row up / down Alt+Up / Alt+Down
Edit cell / cancel / next cell Enter or F2 / Escape / Tab

On macOS use ⌘ in place of Ctrl.